Know what your project should cost
Before you appoint a builder, know what the work should cost on current UK rates. Realistic, room by room, in £/m².
Before you appoint a builder, know what the work should cost on current UK rates. Realistic, room by room, in £/m².
We compare your builder quotes line by line. We tell you which is honest, which has loaded the prelims, and which is missing scope.
Monthly checks on what your builder is claiming versus what is actually built on site. Surprises caught before you pay them.
Plain English help on the things that move UK home build cost: Party Wall Act 1996, planning conditions, 20% VAT on most refurb and extension work.
Trade offs between finishes, structure and programme, costed clearly so you can decide what stays and what goes.
If your builder is over claiming, withholding the snagging list, or refusing to release retention, we get to the bottom of it.
Every Costed service has its own page with indicative fees, a worked process, and answers to the questions buyers actually ask before they appoint.
Before you appoint a builder, you should know what the work should cost. Costed prepares independent pre-build budgets for extensions, loft conversions, basements and full renovations, then reviews contractor quotes line by line. The single best protection against overruns is knowing the number before the first quote lands.
An Extension Budget Review is an independent, itemised cost estimate for your extension, loft or refurbishment, written from your drawings and current UK rates. It gives you the real number before you brief a single builder, so quotes can be tested against a proper benchmark, not hope. Typical UK turnaround: 5–8 working days from receipt of drawings.
A Builder Quote Audit is an independent line-by-line review of one or more contractor quotes for your home project. We test each quote against the drawings, the specification and current UK rates, flagging missing items, inflated allowances, vague provisional sums and contract terms that quietly hand the builder the right to charge more later. Turnaround: 3–5 working days per quote.
A Snagging & Final Cost Report is an independent inspection and cost review at practical completion of your home project. We identify defective and incomplete work, attach a realistic cost to put each item right, and tell you how much should fairly be retained from the final payment until snagging is closed out. Most UK builders quietly accept a properly evidenced retention, and the fee is recovered many times over.
One UK working day response. Fixed-fee proposal, VAT inclusive. No retainer. No obligation.