The construction cost line in a development appraisal: getting it right
The single number that decides whether a scheme is viable. Why developers under-budget it, and how an independent cost expert appraises it.
Pre-contract cost certainty, post-contract control, clean final accounts. Cost plans, priced specs, contract administration and lender monitoring across London and the Home Counties.
Independent cost plans, priced specs, builder quotes analysis and monthly monitoring across SME and mid-market schemes.
Cost plans aligned to design stage so design progresses on budget. We sit alongside, we do not compete.
Adjudication support, EOT and loss & expense narratives, final account negotiation under JCT or NEC.
Independent monitoring surveyor reports, drawdown certification and end-of-loan reconciliation.
Pre-quote cost plans, design stage to 4.
priced specs from drawings and specifications.
Quote strategy, contractor lists, returns analysis.
Valuations, variations, instructions, EOT review.
Independent monitoring surveyor reports for lenders.
Closing the commercial position. Defects and retention.
Drawings, scope or a few lines. By email or upload.
Fixed fee, VAT inclusive. Scope, deliverables and timeline set.
Cost plan, priced spec, quote analysis or post-contract control. Issued in Excel and PDF.
What a Priced Spec is, what it costs, and when you need one. -compliant priced specs from an independent London cost expert.
Independent elemental cost plans through design stage, benchmarked to current London rates. Lock your budget before design commits you to it.
Line-by-line comparison of returned quotes. Anomaly flagging, qualification analysis and contractor recommendation. Independent. London-based.
Independent monitoring surveyor (IMS) for UK development lenders. Drawdown reports, valuation sign-off, cost-to-complete and risk advice.
Monthly valuations, variation control, cost reporting and your build contract build cost oversight. Independent post-contract cost expert for London projects.
Closing out the build preparation, scrutiny and negotiation. Independent cost experts closing out construction projects at the right number.
Quantum analysis, expert reports and adjudication-ready evidence for UK construction disputes. Independent cost experts.

The single number that decides whether a scheme is viable. Why developers under-budget it, and how an independent cost expert appraises it.

A monthly valuation is the contractor's invoice. These are the patterns an independent monitoring surveyor checks for before signing it off.

What it actually costs to build in Greater London right now, by sector and project type, with the labour and material drivers behind the numbers.
One UK working day response. Fixed-fee proposal, VAT inclusive. No retainer. No obligation.